- Earthing and Lightning System::
- Pipe Bonding Clamp
- ⅝” , ¾” Inspection Pit (Earth Pit)
- ⅝” , ¾” ‘A’ Clamp (Rod to Tape)
- ⅝” , ¾” ‘B’ Clamp (Rod to Cable) (16-25, 50, 70mm²)
- ⅝” , ¾” Cable to Rod Tape Clamp (16-25, 50, 70mm²)
- ⅝” , ¾” Tape to Rod to Tape Clamp 2 (25 x 3mm)
- ⅝” , ¾” Earth Rod
- ⅝” , ¾” Earth Rod Coupling (Socket)
- ⅝” , ¾” Earth Rod Cap
- ⅝” , ¾” Earth Rod Drive Stud
- ⅝” , ¾” Earth Rod Spike
- High Tension Clamp (30-40, 40-50, 50-60, 60-70, 70-80, 80-90, 90-100mm)
- Bi-Metallic Cable Lug (Aluminium & Copper) (16mm² - 630mm²) EMA Requirement
- 25 x 6mm Earth Bar
- 25 x 6mm Neutral Bar
- ¾” Air Terminal c/w Base (Aluminium / Copper Alloy)
- 25 x 3mm Conducting Tape (Aluminium / Copper)
- 25 x 3mm Clip & Saddle (Aluminium / Copper Alloy)
- Square Test & Junction Clamp
- Bi-Metallic Connector
- Test Link Box

